Friday, June 14, 2013
Irvington Basement
This is a small basement conversion we did in the Historic Irvington district of Portland. The space was unfinished with just the washer and dryer hooked up. The floor was unimaginably out of level and 1/3 of the space is crawl space only. We Drylocked, framed in and insulated the perimeter walls. Over 15 bags of self leveling compound were used. One of the smaller windows within the foundation was made larger to accommodate egress but cutting the concrete foundation and digging a window well. Partition walls were arranged for: one bedroom with two large closets, a finished laundry/ utility room, and a large living space with covered storage and bookcases. Floating cork flooring was laid and the staircase rebuilt for easier travel and a more finished look. All new electrical and plumbing were added as well. A total of 620 sf of finished space was added to the house.
Monday, May 27, 2013
Laughing Planet
Among one of our clients is the Laughing Planet restaurants which we do a multitude of different projects for.
We were given a plastic menu stand and asked to design and fabricate similar holders out of our "boneyard" of wood scraps. Over 50 individual stands were made.
Laughing Planet does value reuse and locally handcrafted items-
We were given a plastic menu stand and asked to design and fabricate similar holders out of our "boneyard" of wood scraps. Over 50 individual stands were made.
Laughing Planet does value reuse and locally handcrafted items-
Similarly we have made over 300 of these table stands used for fun facts and promotion-
Again, materials are not purchased and are saved from being dumped.
Here is a before and after picture of the Gabriel Park location seating change. We fabricated and installed the benches -
Monday, April 8, 2013
Gordon Kitchen
Here are before and after pictures of a kitchen we remodeled in SE Portland. New post and beams in basement and kitchen/ dining allowed us to open the wall dividing the dining room and kitchen. New custom cabinets, solid surface counters, tiled backsplash, fir flooring and new lighting all contributed to new space.





Wednesday, April 3, 2013
Bench and Backsplash
Hall Bath
Here is a small hall bath in which we did an updating remodel in just a couple days. Not much was done but there sure is a dramatic change.
Sunday, February 17, 2013
Irvington basement
We complete so many jobs each year that we can never seem to keep up with photographs to document our work. This post is of a job done over 2 years ago which I did not document at the time. We completed the basement remodel as a subcontractor for Shelbyville including all carpentry, tile, and management. The bar was built of fir and a mahogany top with a paperstone sink countertop. The fireplace was detailed with concrete panels and a mantle built from a salvaged timber. The shower was a design on the fly as the client supplied an variety of tiles of differing colors. The original slab floor was etched and stained.
Subscribe to:
Posts (Atom)

