24 November 2013
We have passed all of our cover inspections and insulation and sheetrock are underway.
|
Here is Jason (electrician) enjoying his last day of rough in and passing his inspection
|
We had to have a large hole drilled through the brick for the 8" range hood exhaust pipe
|
Furnace up and running |
|
Insulation in basement |
|
Sheetrock delivery |
11/27
Sheetrock is almost done. Here is the latest installment the day before Thanksgiving! Use your imagination; things are going to come together very quickly from here!
|
new kitchen layout; sink, dishwasher, etc |
|
bench and stove |
|
sink area |
|
bench and stove |
|
bonus storage built-in(ish) |
|
old windows get new life |
|
laundry and new water heater from bottom of stairwell (at basement) |
|
big basement addition from laundry |
|
basement from laundry 2 |
|
basement from north door |
|
basement from south door |
|
"office" windows |
|
furnace room !!!! zoning feeders..... shit is cookin' |
|
basement shower: |
|
basement bathroom vanity location |
|
clawfoot tub locale |
|
clawfoot getting refinished! |
|
clawfoot beatified |
|
main floor bath floor heat wiring; basement floor bath also has floor heat in which we had to add a insulation membrane for optimal performance against the concrete slab heat loss |
EAT, DRINK, BE MERRY.... AND BUILD SOME MORE!
12/16
Finish phase is well underway. Tile, trim, cabinetry are all happening. Here are a couple recent photos. More to come this week.
|
hearth tile layout |
|
basement shower |
|
basement bath floor |
|
basement bath vanity carcass and floor |
|
salvaged fir case and base in basement |
|
master bed built in closet carcasses |
1/11/14
So it has been a while since i've made an installment. we all have opened our presents, celebrated a new year, an we are now welcoming the rain to the northwest. the job is approaching finishes, but that also means a lot of the surfaces are covered for protection! (not that good for pictures). here are some that should continue the curiosity and show some finishes already completed.
|
gerheart (left) and vladimir doing the miles of tile in the master bath |
|
wainscot turning transition to the shower |
|
floor and shower entry |
|
shower ledge and infinity drain in the shower |
|
countertop (covered) with incorporated sill for the window |
|
crema marfil countertop for master |
|
new hearth tile |
The upstairs also has had the floors sanded and one coat of finish.
|
basement just waiting for carpet, paint and a new door! |
Many more pictures to come shortly.