24 November 2013
We have passed all of our cover inspections and insulation and sheetrock are underway.
|
Here is Jason (electrician) enjoying his last day of rough in and passing his inspection
|
We had to have a large hole drilled through the brick for the 8" range hood exhaust pipe
|
Furnace up and running |
|
Insulation in basement |
|
Sheetrock delivery |
11/27
Sheetrock is almost done. Here is the latest installment the day before Thanksgiving! Use your imagination; things are going to come together very quickly from here!
|
new kitchen layout; sink, dishwasher, etc |
|
bench and stove |
|
sink area |
|
bench and stove |
|
bonus storage built-in(ish) |
|
old windows get new life |
|
laundry and new water heater from bottom of stairwell (at basement) |
|
big basement addition from laundry |
|
basement from laundry 2 |
|
basement from north door |
|
basement from south door |
|
"office" windows |
|
furnace room !!!! zoning feeders..... shit is cookin' |
|
basement shower: |
|
basement bathroom vanity location |
|
clawfoot tub locale |
|
clawfoot getting refinished! |
|
clawfoot beatified |
|
main floor bath floor heat wiring; basement floor bath also has floor heat in which we had to add a insulation membrane for optimal performance against the concrete slab heat loss |
EAT, DRINK, BE MERRY.... AND BUILD SOME MORE!
12/16
Finish phase is well underway. Tile, trim, cabinetry are all happening. Here are a couple recent photos. More to come this week.
|
hearth tile layout |
|
basement shower |
|
basement bath floor |
|
basement bath vanity carcass and floor |
|
salvaged fir case and base in basement |
|
master bed built in closet carcasses |
1/11/14
So it has been a while since i've made an installment. we all have opened our presents, celebrated a new year, an we are now welcoming the rain to the northwest. the job is approaching finishes, but that also means a lot of the surfaces are covered for protection! (not that good for pictures). here are some that should continue the curiosity and show some finishes already completed.
|
gerheart (left) and vladimir doing the miles of tile in the master bath |
|
wainscot turning transition to the shower |
|
floor and shower entry |
|
shower ledge and infinity drain in the shower |
|
countertop (covered) with incorporated sill for the window |
|
crema marfil countertop for master |
|
new hearth tile |
The upstairs also has had the floors sanded and one coat of finish.
|
basement just waiting for carpet, paint and a new door! |
Many more pictures to come shortly.
Soren, we absolutely love following all the progress being made, the house is looking fantastic! We can hardly believe the transformation taking place. The basement is great, just as we envisioned. The tiling in the master bath looks amazing, the workmanship exceptional! Your team is doing a great job. Can't wait for more pics! :)
ReplyDelete